01-20-2024, 06:53 PM
As of Thursday, shuttle was inspected and registered.
Friday afternoon, removed the 2 back jump seats.
Today (Saturday), we spent about 4 1/2 hours removing stuff. Most of the side/wall panels are gone, most of the ceiling panels are gone, and the carpet is gone.
Once the back AC is removed, we can finish the last wall and ceiling panel.
We are debating if I should keep the heater. The wheelchair lift is still in it, but waiting for someone from the local council on aging to come check to see if they want it.
It's supposed to rain a lot next week. Hopefully more updates soon. I'll get pictures tomorrow afternoon.
Friday afternoon, removed the 2 back jump seats.
Today (Saturday), we spent about 4 1/2 hours removing stuff. Most of the side/wall panels are gone, most of the ceiling panels are gone, and the carpet is gone.
Once the back AC is removed, we can finish the last wall and ceiling panel.
We are debating if I should keep the heater. The wheelchair lift is still in it, but waiting for someone from the local council on aging to come check to see if they want it.
It's supposed to rain a lot next week. Hopefully more updates soon. I'll get pictures tomorrow afternoon.
YARC ~ 2 Stinkin' Badgese
ROOIRIA
YARC Name: Tripping Over Shadow
Official YARC Title: The Wizard of Y.A.R.C. (Popeye says so!)
Future home/rig: 2009 Ford E350 Shuttle Bus
ROOIRIA
YARC Name: Tripping Over Shadow
Official YARC Title: The Wizard of Y.A.R.C. (Popeye says so!)
Future home/rig: 2009 Ford E350 Shuttle Bus